How an X-folding container house is installed on site

Understand the preparation, unfolding, securing and utility-connection workflow.

How an X-folding container house is installed on site
01

Prepare the foundation

Use a level, load-bearing base with drainage and access for lifting equipment. Confirm anchor and utility positions before the unit arrives.

02

Position and unfold

Lift the folded module into position, open the side structures in sequence and keep personnel clear of moving frame components.

03

Seal and secure

Complete structural fasteners, weather seals, roof and wall interfaces, then inspect doors and windows for alignment.

04

Commission the unit

Connect electrical and plumbing services, test protection devices and water systems, and complete a final safety inspection.