What to prepare
Turn local requirements into a clear project file.
Project intake
Confirm municipality, intended use, occupants, quantity, delivery route, site access and target handover date.
Model and scope review
Compare the exact model, layout, insulation, windows, doors, utilities, finishes and installation scope.
Delivery coordination
Separate factory scope from freight, customs, local unloading, foundations, utilities and site works.
Handover file
Prepare drawings, material schedules, structural information, fire and services documents, manuals and warranty boundaries.
- Destination and intended-use brief
- Exact model drawings and material schedule
- Transport, installation and site assumptions
- Questions for the local architect, engineer or certifier
| Project stage | Pre-quotation and local review |
|---|---|
| Evidence | Drawings, schedules, calculations and certificates as applicable |
| Decision owner | Local architect, engineer or certifier |
Official references
Use primary sources for the final review.
- Confirm the applicable project documents with the local professional.
This page is a project preparation guide, not an automatic certification or legal opinion.